PROJECT BACKGROUND:
Canadian Consulting Engineers was retained by the Town of Drayton Valley to design and construction of Un-Named Creek Stormwater Management.
PROJECT OBJECTIVE:
The project’s objective was to manage stormwater in the River Ravine Area.
PROJECT CHALLENGES:
The key challenges were:
• Complex network of high pressure oil and gas pipelines and shallow utilities
• Approvals from the authorities
PROJECT Summary:
The project comprised on 2 CSP culverts of 600mm and 500mm diameters of various lengths, a stormceptor and approximately 240m2 Class 1 rip rap.
PROJECT SERVICES:
Canadian Consulting Engineers provided preliminary design, detailed design, project management and construction administration