by ins1_admin | Aug 30, 2022 | Featured Project, Projects, Wastewater
South Sanitary Trunk Main Upgrading Featured Project PROJECT BACKGROUND:The Town of Drayton Valley wastewater collection system was at significant risk of overloading, causing sewer backup and overloading sewage lagoon due to excess amounts of wet weather inflow and...
by ins1_admin | Aug 30, 2022 | Featured Project, Projects, Wastewater
Rocky Rapids Sewage Lagoon Expansion Featured Project PROJECT BACKGROUND: The Hamlet of Rocky Rapids is located in the north half of the Brazeau County, near the intersection of Township Road 500 and Range Road 72. The sewage lagoon capacity was not enough to...
by ins1_admin | Aug 30, 2022 | Featured Project, Projects, Wastewater
Birchwood Sewage Lagoon Expansion Featured Project PROJECT BACKGROUND:The Birchwood Sewage Lagoon is located in the northeast area of the Brazeau County near the intersection of Township Road 494 and Range Road 55. The sewage lagoon was restricted to accept only...
by ins1_admin | Aug 26, 2022 | Projects, Stormwater and Drainage
Un-Named Creek Stormwater Management PROJECT BACKGROUND:Canadian Consulting Engineers was retained by the Town of Drayton Valley to design and construction of Un-Named Creek Stormwater Management.PROJECT OBJECTIVE:The project’s objective was to manage stormwater in...
by ins1_admin | Aug 26, 2022 | Projects, Transportation
River Ravine Road Rehabilitation PROJECT BACKGROUND:Canadian Consulting Engineers was retained by the Town of Drayton Valley to design and construction of River Ravine Road Rehabilitation.PROJECT OBJECTIVE:The project’s objective was to rehabilitate River Ravine Road....
by ins1_admin | Aug 26, 2022 | Projects, Transportation
Northwest Quadrant Trail PROJECT BACKGROUND:Canadian Consulting Engineers was retained by the Town of Drayton Valley to design and construction of Northwest Quadrant Trail. PROJECT OBJECTIVE:The project’s objective was to extend and interconnect existing trail...